Closure of Nancy Rothwell Building Ground Floor entrances (Summer 2024)
22 Jul 2024
Building users may experience some minor disruption over the Summer when entering and exiting the building
Between Monday, 29 July – Friday, 13 September, essential remedial works will take place outside the entrances to the Nancy Rothwell Building (Engineering Building A).
To allow the work to take place, some of the doors at both the North entrance (Grosvenor Street) and South entrance (Booth Street East) will be closed at different periods, reducing access in and out of the building (details provided below). During these works, access via the Rumford Street entrance of the building will be unaffected, including the accessible doors and out-of-hours access via the swipe-card entrance.
Grosvenor Street entrance (North entrance) | Rumford Street entrance | Booth Street East entrance (south entrance) | |
29 July – 4 August | Open as usual | Open as usual, including out of hours and accessible access doors | Open as usual |
5 August –11 August | Reduced access | ||
12 August – 18 August | |||
19 August – 25 August | |||
26 August – 1 September | Reduced access |
Open as usual | |
2 September – 8 September | |||
9 September – 13 September |
Bicycle storage
Furthermore, between 29 July – 25 August, all bicycle stands outside the Grosvenor Street entrance will be inaccessible, so colleagues should use alternative stands outside the Booth Street East entrance. Access to the Active Travel hub will be unaffected by this work.
We apologise for any inconvenience caused. If you have any questions, please get in touch via TEAM@manchester.ac.uk